Measure A Priorities
Highest Priority – Potential First Round of Projects
Items Listed in the 2012 Facilities Master Plan
- Campus Safety and Security Updates and Upgrades
- New building 600/800 (Science/Viticulture/Horticulture/Computer Science/ Computer Network Tech)
- Vehicular & Pedestrian Circulation & Parking
- Public Safety
- Automotive & Welding
- 2100/2200 Library/Language Arts/Tutorial
- Building 300 / Student Center
- Visual Arts Building – painting, drawing, sculpture, ceramics, art gallery, computer graphic design
- Athletic facility improvements
Secondary Priority
ITEMS NOT LISTED IN THE 2012 FACILITIES MASTER PLAN
ITEMS ARE GROUPED BY SIMILAR ATTRIBUTES
- Items that are new, something we currently don't have or don't do
- Items that desire to be expanded, something we currently have but we want more of it
- Items that need refreshing/renewal, something that exists, but is tired or in need of some new life
New – Not Listed in the 2012 Facilities Master Plan
- Makers Space, Innovation Hub for Tech, Partner w/Tech Companies
- Student Union - Gathering Place for Students
- Learning Communities Space
- Parking Structure
- Machine Shop to support Auto/Welding/Engineering
- Expansion Proposed B3600 to include: Full-Sized Gymnasium, Fitness Center, Classroom, Faculty Offices, Storage, Locker Rooms, Athletic Training Area
- Permanent Scoreboard for the Synthetic Turf Field
- Sand Volleyball Courts
- Walking Trails including Murray Ranch
- Golf Practice Facility
- 2nd Gym Space
- Bike Trail Connectivity
- Social Science Research Lab
- Dark Sky Space (Planetarium)
- Field Station
- Proctor Center
- Event Center
Expanded - not listed in the 2012 facilities master plan
- Health Center / Integrated Mental Health Center
- Increased Library Materials Budget ($300k per year minimum)
- ECD Safety Issues
- Larger Bio Learning Center
- Expansion of Science Buildings (1800/1850)
- Amphitheater Completion, Structures and Theater Program Storage
- Storage Needs for All Disciplines
- Additional Dining Area for Students
- Energy Storage & Production Enhancements
- Cafeteria Space Enhancements
Renew/Refresh – Not Listed in the 2012 Facilities Master Plan
- 2400 Refresh/Renew and Outside Elevator
- Patrol Car for Campus Safety
- 1800 Renovation
- Upgrade Pool; Resurfacing, etc.
- Replace Synthetic Turf Field
- Refurbish Track and Field