Skip to main content
Las Positas College

The LPC campus will reopen for regular operations on January 2, 2025.

Building 2100

Preliminary Building 2100 Concept- December 21, 2016

The building footprint could be about 30,000 SF using the Bld 2100 and 2200 footprint plus the area plus between the buildings.

Building footprint of 2100

Building use could be

Use Current Location Current ASF New ASF
Integrated Learning Center Bld 600 3035 4000
Math Lab Bld 600 1953 2000
English Lab + 4 Classrooms Bld 400 4909 6000
Math X, Classroom Bld 500 2787 3500
Tutoring. Testing Bld 2400 800 1500
Computer Lab Room 805 inc classrooom 5300 6000
Comp Network Tech Rooms 804/5 & A 2000 3000
Faculty Offices Bld 2100 - 100 @100 ASF 6700 10000
Conf, Adjuncts, Dean Bld 2100 @ 15% of Office ASF 500 1500
Book Store Bld 1300 2700 4000
Student Center New   4500
Large Lecture 200 @ 30 ASF Room 801 3000 6000
Student Clubs/Groups 8 @ 200 ASF   1600
Food Grab & Go   1000
Classrooms Bld 2200 4 @1000 4810 4000
Total   38,494 58,600

Assuming 65% efficiency 58,600 ASF equals 90,150 GSF equals 3 stories @ 30,000 GSF/Floor.